Open Access
Issue
Int. J. Metrol. Qual. Eng.
Volume 1, Number 2, 2010
Page(s) 71 - 82
DOI https://doi.org/10.1051/ijmqe/2010016
Published online 17 December 2010
  1. Y. Wang, X. Chen, Q. Liu, N. Gindy, Optimization of machining fixture layout under multi-constraints, Int. J. Mach. Tools Manuf. 46, 1291 (2006) [CrossRef]
  2. Y.F. Wang, Y.S. Wong, J.Y.H. Fuh, Off-line modelling and planning of optimal clamping force for an intelligent fixturing system, Int. J. Mach. Tools Manuf. 39, 29 (1999)
  3. Y. Wu, Y. Rong, W. Ma, S.R. LeClair, Automated modular fixture planning: accuracy clamping and accessibility analyses, Robot. Comput.–Integr. Manuf. 14, 17 (1998) [CrossRef]
  4. E.C. DeMeter, Restraint analysis of fixtures which rely on surface-contact, ASME J. Eng. Ind. 116, 207 (1994) [CrossRef]
  5. Z. Xiong, M.Y. Wang, Z. Li, A near-optimal probing strategy for workpiece localization, IEEE Trans. Robot. 20, 668 (2004) [CrossRef]
  6. Y.X. Chu, J.B. Gou, H. Wu, Z.X. Li, Workpiece localization algorithm: Performance evaluation and reliability analysis, J. Manuf. Syst. 18, 113 (1999) [CrossRef]
  7. B. Li, S.N. Melkote, Improved workpiece location accuracy through fixture layout optimization, Int. J. Mach. Tools Manuf. 39, 871 (1999) [CrossRef]
  8. M.Y. Wang, An optimum design for 3-D fixture synthesis in a point set domain, IEEE Trans. Robot. Autom. 16, 839 (2000) [CrossRef]
  9. A. Raghu, S.N. Melkote, Analysis of the effects of fixture clamping sequence on part location errors, Int. J. Mach. Tools Manuf. 39, 871 (1999) [CrossRef]
  10. Y.C. Chen, C.L.P. Chen, The importance of sequence in clamping prismatic workpieces in fixturing processes, in Proc. of the 1996 IEEE, Int. Conf. on Robotics and Automation ISBN, Minneapolis, MN, 1996, pp. 503–508
  11. J.M. Schimmels, M.A. Peshkin, Force-Assembly with friction, IEEE Trans. Robot. Autom. 10, 465 (1994) [CrossRef]
  12. P. Bourdet, A. Clement, Controlling a complex surface with a 3 axis measuring machine, Ann. CIRP, 354 (1976)
  13. P. Bourdet, Métrologie tridimensionnelle et géométrique des pièces mécaniques, Université Paris VI – ENS de Cachan, Licence de Technologie Mécanique (1998–1999)
  14. P. Bourdet, A. Clement, Optimisation des montages d’usinage, Contrat de recherche DRME (1972)
  15. D. Duret, Qualité de la mesure en production (Eyrolles, Paris, 2008)
  16. J.D. Lee, L.S. Haynes, Finite-element analysis of flexible fixturing system, ASME J. Eng. Ind. 109, 134 (1987) [CrossRef]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.