Issue |
Int. J. Metrol. Qual. Eng.
Volume 3, Number 1, 2012
|
|
---|---|---|
Page(s) | 15 - 18 | |
DOI | https://doi.org/10.1051/ijmqe/2012007 | |
Published online | 26 September 2012 |
Calculation of measurement uncertainty for cellulose based transformed board material in tensile testing
TÜBITAK UME, Force Group Laboratory, Gebze, Kocaeli, Turkey
⋆ Correspondence: sinan.fank@ume.tubitak.gov.tr
⋆⋆ Correspondence: bulent.aydemir@ume.tubitak.gov.tr
Received: 16 March 2012
Accepted: 24 March 2012
Today’s global economy obliges manufacturers to produce their products in high quality with cheaper cost. Thus, manufacturers must develop their products applying tests to get better performance and higher quality before distributing them to the competitive market. In order to produce long working life of transformer reactors without losing their performance, different tests including axial and flexural testing are applied on the cellulose based laminated board material used in production. During development of laminated board material, test results should be known very well and the measurement uncertainty of tensile tests should be calculated taking into account all parameters. In this study, effective parameters on the quality of tensile testing causing an increase on the measurement uncertainty are investigated. Tensile strength and elongation test of laminated board material were carried out according to IEC 60641-2 and the uncertainty contributions based on experimental results were calculated. The results and impact of the uncertainty parameters are presented in detail.
Key words: Tensile testing / measurement uncertainty / laminated pressboard
© EDP Sciences 2012
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.