Issue |
Int. J. Metrol. Qual. Eng.
Volume 13, 2022
|
|
---|---|---|
Article Number | 5 | |
Number of page(s) | 11 | |
DOI | https://doi.org/10.1051/ijmqe/2022005 | |
Published online | 08 June 2022 |
Research Article
Assembly process optimization of electromechanical meters based on robust design
College of Quality and Safety Engineering, China Jiliang University, Hangzhou 310018, China
* Corresponding author: zhoujuan@cjlu.edu.cn
Received:
30
October
2021
Accepted:
29
March
2022
The assembly precision of the magnetic system of an electromechanical meter is an important guarantee for the measurement accuracy of the meter. The large gap between the two poles of the magnetic system is the key point that affects the assembly precision and is also the difficulty that electromechanical meter manufacturers face. In this paper, the controllable factors that affect the gap of a magnetic system are selected by performing an orthogonal experiment, the assembly process is analyzed, and the noise factors are selected; the orthogonal design achieved by using inner and outer array is used to design the experiment scheme, and the optimal combination of process parameters with a large signal-noise ratio (SNR) and good robustness is found through the experiment. Through experimental verification, the improved process capability index reaches 1.34, and the optimization effect is remarkable.
Key words: Magnetic system assembly of meters / robustness / orthogonal experiment / signal-noise ratio
© J. Zhou et al., Published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.